Reviews: 5.0 Stares Based on 32 reviews
-
Christine L.
Excellent service from the beginning to the end of the task. The design proposal was professionally done and communication was easy via email or text. The price proposal was very reasonable comparing with two other companies I have obtained the quote from; especially they are providing the better panels and inverter. The installation was done in two days.
Friday , 11 Oct 2019
-
Linda M.
The employees at Smart Solar Design Construction did a very professional job on our solar system. We had our solar installed at the beginning of October, and everything is running great. Everyone we were in touch with at Smart Solar were communicative throughout the process and we are very pleased with our decision to go with this company. Highly recommended!
Monday , 25 Nov 2019
-
Josh R.
I almost didn't make the move to get solar as it was borderline whether or not it made sense for me. Aaron of Smart Solar Construction of SoCal presented an option very close to being even for me. I figured, if it protects me from increases in the future, a few extra dollars a month now was worth it. As soon as the contract was signed, Lloyd was very prompt in sending a personal message outlining what I should expect. Being a detail oriented, methodical person, I appreciated knowing what to expect. Gage reached out and touched base as to the timeline expectation. He met with me to discuss my installation concerns about visibility and HOA guidelines. His team of installers, in particular Stephen and Parris, were professional and easy to talk to/work with. I feel they accommodated my requests and left my home with a tight installation and clean job.
Thursday , 29 Jun 2017
-
Louis F.
We made the mistake of calling a few Solar companies only to find that they would bombard us with calls. Went on Nextdoor I believe and saw all the good reviews with Smart Solar so we called them. The owner of the company came over in a no pressure visit, went over our needs, showed all the cheap and expensive options, made recommendations, etc. Not one sales call from the company while we were thinking about it. Once we moved forward, they were on time, worked the entire time, were professional, etc. We had poor experiences with contractors in the past, but these guys are legit. I honestly would only recommend Smart Solar if you are serious about getting solar.
Tuesday , 04 Feb 2020
-
Michelle L.
After 4-5 bids from other solar company, we ended up with Smart Solar. We did re-roof (replaced 40 lbs fiberglass underlayment, fixed plywood, fascia, starter board where needed, applied new flashing, power wash roof tiles), and installed new solar panels, painted all flashings and other parts to best match the color of the house. Smart Solar Construction gave the most competitive price AND customer service was awesome! The roof people who came (Cesar, Walter, Evert, and more) were excellent and very detailed oriented. The roof team really spent their time explaining each step to ensure customer satisfaction, our family really appreciated that. After the solar were installed, Gage came on to ensure everything is working properly and also instructed me how to view the solar production on internet. Gage was very fast at replying questions (text/calls), which we really appreciated.
Wednesday , 12 Jul 2017
-
Read More
Copyright © Best Solar Choice 2023

